TECL 39574San Antonio, Bexar County & the Hill Country210-760-6407

Panel replacement

Electrical panel replacement in San Antonio, TX

Full panel replacements, from old Federal Pacific and Zinsco panels to outdated 100-amp systems, with the permit, the utility coordination and the city inspection handled.

5.0 rating · 229 Google reviews · as of Nov 9, 2026

An outdoor meter-main panel open with new breakers installed
Job record checkedOur job: outdoor meter-main panel with new breakers · San Antonio · March 2026
  • TECL 39574Licensed Texas Electrical Contractor
  • 5.0 · 229 Google reviewsAs shown on our Google profile, Nov 9, 2026
  • 26+ years on the toolsCombined experience of our electricians
  • Permits when requiredPulled and inspected where the city requires

When a panel needs replacing, not just repairing

  • The panel is 25+ years old. Older panels can struggle with modern electrical loads.
  • It's a Federal Pacific or Zinsco panel. These need careful evaluation because of documented performance concerns.
  • Breakers trip often. A sign the panel is overloaded or failing.
  • You're adding an EV charger or a major appliance. Whether the existing service carries the new load is decided by a load calculation, not by panel size alone.
  • An insurer or a home sale requires it. Older panels can hold up coverage or a sale.
  • There's a burning smell or discoloration at the panel. Treat this as an emergency and call right away.

How a panel replacement works

  1. Estimate. We look at your current panel, the service entry and what needs upgrading.
  2. Permit before work starts. Panel replacements in San Antonio need a permit from the City of San Antonio Development Services Department. We pull it.
  3. Utility coordination. We coordinate the CPS Energy disconnect and reconnect.
  4. Replacement day. Most replacements take 4 to 8 hours start to finish, with the power off for part of that time.
  5. City inspection. We schedule the final inspection and see it through before closing the job.

What goes into the price

Panel replacement cost depends on the panel size, the service amperage, permit fees and whether a utility disconnect is needed. A complete job includes the new panel, the permit, utility coordination, the city inspection, and the breakers, grounding and bonding to current code. We talk the cost through with you before work starts.

Panels we replace

Federal Pacific Electric (FPE) Stab-Lok panels

Federal Pacific Stab-Lok panels need careful evaluation because of documented performance concerns. If your San Antonio home was built between 1950 and 1990 and the panel has never been replaced, there's a good chance you have one. Replacement may be recommended based on condition, breaker performance, insurer requirements and the needs of the electrical system.

Zinsco and GTE-Sylvania panels

Zinsco panels have aluminum bus bars that can overheat and fail to trip during a fault. They turn up mainly in homes built in the 1970s. Replacement may be recommended based on condition, breaker performance, insurer requirements and the needs of the electrical system.

100-amp service panels

Whether a service upgrade is needed depends on the calculated load, the condition of the existing equipment, the new loads you're planning and the load-management options available. A 100-amp service that has carried a house for decades can keep doing so; adding an EV charger, a heat pump or a generator is what usually changes the arithmetic. We run the load calculation and coordinate with the utility, upgrading to 200-amp or 400-amp service when the calculation calls for it.

Panel Replacement or a Service Upgrade?

They often get treated as one job, but they solve different problems. A panel replacement changes the equipment your breakers sit in; a service upgrade raises how much power the house can draw from the utility. Running out of breaker spaces doesn't mean the house is out of capacity. It's worth having us look at the service when:

  • It's been damaged. A tree came down on it, or there's rust or water getting into the equipment.
  • You're adding a large load. An EV charger, central heating and air, a larger electric water heater, a pool or hot tub, or an addition or shop.
  • There's nowhere to land a new circuit. That can mean a larger panel rather than a larger service. The load calculation tells us which.

A damaged 100-amp service doesn't automatically have to come back at 200 amps. If you're not adding anything, going back at 100 amps is a legitimate answer. If you are, and the load calculation says the service has to grow, sizing up while the work is open costs less than doing it twice. Our article on when a house actually needs a bigger service goes through the decision in more detail.

FAQ

Panel replacement questions

How much does an electrical panel replacement cost in San Antonio?

It depends on panel size, service amperage, permit fees and whether a utility disconnect is required. Call 210-760-6407 and we'll talk through your home's setup.

Do I need a permit for a panel replacement in San Antonio?

Yes. Electrical panel replacements in San Antonio require a permit from the City of San Antonio Development Services Department. We handle the permit, the inspection and the sign-off.

How long does a panel replacement take?

Most panel replacements take 4 to 8 hours. Your power will be off during part of that, usually 2 to 4 hours. We coordinate the CPS Energy disconnect and reconnect so it goes as quickly as possible.

Does a new panel help when selling a home?

A code-compliant, permitted panel is a positive line item in a home inspection report, and it makes room for an EV charger. Federal Pacific Stab-Lok and Zinsco panels often come up in sale negotiations.

Do you replace panels outside San Antonio?

Yes, throughout our service area, including Canyon Lake, Cibolo, Boerne, New Braunfels, Schertz, Seguin, Stone Oak, Helotes, Universal City and Converse.

How it works

From your call to a finished job

  1. Tell us what's going on

    Call, or send a short request with the type of work and your ZIP code.

  2. We call to schedule

    A timing preference isn't a booked slot. We confirm the time with you by phone.

  3. We find the cause

    A licensed or registered electrician looks at the problem and talks you through the options.

  4. Permit when required, then the work

    When the job or the city requires a permit, we pull it before the work starts, then arrange any inspection the city requires during or after the work.

Plan your panel replacement

Tell us about the panel you have and what you want it to run. We call to confirm a time.

Call 210-760-6407Request a quote